Project location

Hangzhou, Zhejiang Province, China

Cooperation period

2020 – 2026

Product used

Axminster carpet (uniform process for the entire project)

Application areas

Hotel public corridors, guest rooms, leisure areas, etc.

Total carpet area

7,000 square meters

Production lead time

30 days

Installation lead time

15 days (phased simultaneous installation in different areas, seamlessly integrated with the renovation schedule)

Client Background

Die Lai Zhejiang Hotel is a high-end cultural tourism hotel under the Die Lai brand, located in the core area of Santai Shan Road, West Lake, Hangzhou. Situated adjacent to the West Lake Scenic Area, it is a five-star resort hotel that integrates historical heritage, Jiangnan charm, and modern luxury.


The hotel design centers on "the fusion of West Lake landscape and Republican era elegance", aiming to provide guests with a living experience that combines the artistic conception of Jiangnan culture with international quality.


e162705b068667a2df3a0ff7ebf5402d

Project Challenges and Requirements

As a landmark resort hotel by West Lake, the client put forward multiple high requirements for the carpet:


• Design uniqueness: The carpet must deeply integrate elements of "West Lake landscape and Jiangnan garden", matching the hotel's elegant light luxury design language. Patterns in different areas should not only share a unified theme but also adapt to the functional characteristics of each space.


Functional complexity: Guest rooms and public areas require high wear resistance, resistance to matting, and easy cleaning. Guest room corridors need to balance foot comfort and durability. At the same time, all areas must meet the sound absorption and noise reduction needs of a resort environment.


Delivery timeliness: The hotel opening / renovation schedule is fixed. Carpets must be delivered in precise batches according to the renovation schedule. Some irregularly shaped spaces place very high demands on production and installation coordination.


Brand consistency: As a high-end cultural tourism hotel, the carpets must meet Die Lai brand quality standards and environmental requirements. All products must pass strict third‑party testing and be suitable for the hotel's long‑term reception (hospitality) and operational needs.

Our Solutions and Service Process

Phase 1: In-depth communication and design co-creation

At the beginning of the project, the Dongsheng team conducted multiple rounds of in-depth discussions with the hotel management and interior design company. They not only studied the renderings but also visited the site to experience the light, traffic flow, and Jiangnan artistic atmosphere.


Using "West Lake landscape" as the main inspiration, the designer team created custom Axminster carpet solutions for different spaces:

 Leisure area: High‑density wear‑resistant Axminster process was used. Elements such as West Lake ripples and the silhouette of Broken Bridge were abstractly represented. The colors reproduced the dark green and light gray of West Lake. The high‑density weaving provides stain resistance and resistance to matting, balancing visual appeal with durability under high‑frequency use.

Guest rooms: Medium‑high density Axminster process was used. A light color base is combined with simple landscape line patterns. The style is gentle and elegant, naturally blending with the interior soft furnishings, creating a quiet and comfortable resting atmosphere.

Corridors: Medium‑high density Axminster process was used. The pattern colors remain consistent with those in the guest rooms, creating a coherent visual effect. For irregular areas such as curved corridors, the pattern design was specially optimized to ensure natural, smooth, and complete pattern transitions at the seams.


1665567887795
1665567835702
1665567835702
1665567837745
1665567837745
1665567857091
1665567857091

Phase 2: Process matching and precise production

After the design solution was finalized, Dongsheng's production team quickly stepped in to ensure that the process for each Axminster product precisely matched the functional requirements of each area:


High‑traffic public areas: High‑density wear‑resistant Axminster process was used. The high‑density weaving improves the carpet's resistance to matting and staining, extending its service life.

Guest rooms and corridors: Medium‑high density Axminster process was used, balancing foot comfort and durability while reducing carpet deformation caused by long‑term foot traffic.

All products underwent 100% full inspection before leaving the factory, including more than 20 tests such as color fastness testing, flame retardancy testing, and wear resistance testing, ensuring compliance with Die Lai brand quality standards and environmental requirements.


6的副本
6的副本
09的副本
09的副本

Phase 3: Flexible production scheduling and on‑time delivery

Hotel renovation involved multiple trades working in parallel. The carpet delivery schedule had to be precisely coordinated with the construction progress of each area. Dongsheng initiated the "dedicated project team" model, and the production plan was split into 3 batches for precise delivery:


First batch: Priority delivery of Axminster carpet for guest room corridors, to support the guest room renovation schedule.

Second batch: Mid‑stage delivery of Axminster carpet for public areas, matching the public area finishing schedule.

Third batch: Final delivery of Axminster carpet for corridor areas, suitable for the completion of high‑end zones.


A site coordinator was assigned to the project team, dynamically adjusting the supply rhythm according to construction progress to ensure no delay to the opening / reception schedule. Even when construction progress was temporarily adjusted, the team could respond quickly to guarantee delivery.


IMG_8898的副本
IMG_8898的副本
IMG_9016的副本
IMG_9016的副本
IMG_9025的副本
IMG_9025的副本

Phase 4: On‑site installation and full guidance

After the carpets arrived on site, Dongsheng's after‑sales technical team simultaneously arrived to provide full on‑site installation guidance:

For large‑area Axminster carpets, technicians focused on guiding workers in pattern matching and seaming to ensure continuous and accurate patterns.

For irregular areas (curved corridors, irregular banquet halls), technicians measured curves and dimensions on site, guiding workers in precise cutting to ensure a seamless installation effect.


After installation, technicians cooperated with the hotel party for acceptance inspection, and also provided cleaning and maintenance training, explaining daily care techniques for Axminster carpets to extend their service life.


1665567879868

Client Feedback and Evaluation

After the hotel renovation / opening, the Axminster carpet became one of the highlights of the space, receiving high praise from both the owner and the management:


"Dongsheng Axminster carpet perfectly realized the elegant Jiangnan artistic conception we wanted. The public areas are wear‑resistant and stain‑resistant, the guest rooms are comfortable underfoot, and the texture exceeded our expectations. From design and production to installation, Dongsheng's professional team followed through the entire process, with efficient delivery and considerate service, making our project progress very smoothly."


– Project Manager of Die Lai Zhejiang Hotel

Our Comprehensive Advantages

Dongsheng Carpet was able to excellently complete a high‑end cultural tourism hotel project like Die Lai Zhejiang Hotel thanks to its systematic comprehensive strength accumulated over many years:


• Full industry chain control: The group has a complete industrial chain from wool spinning, dyeing and finishing to Axminster weaving and finishing – all eight major steps are under its own control, unaffected by external supply chain fluctuations, ensuring stable quality and delivery time.


Customized process capability: With many years of deep focus on Axminster carpet technology, Dongsheng can customize products with different densities, patterns, and grammages according to the functional requirements of different areas – from high‑wear public areas to high‑luxury VIP suites, achieving full‑scene adaptability.


Full‑cycle considerate service: Each project is assigned a dedicated project team providing one‑on‑one follow‑up throughout the process, including transparent production progress, a 24‑hour response mechanism, on‑site installation guidance, and post‑completion maintenance training, giving clients peace of mind.

prev
Liyang Zhongguancun Hotel Carpet Project:6,000 sqm Axminster&Printed Carpets by Dongsheng Carpet
Dongsheng Carpet Provided Axminster and Hand-Tufted Carpet Solutions for Ningbo Qianhu State Guesthouse
next
Recommended for You
Get in touch with us
One-Stop Carpet Solution Provider
Custom Carpet Solutions for Every Space — Covering Hotels, Offices, Commercial Spaces, Homes, and Beyond
Contact Us
Phone/WhatsApp: +86 15376335686
Address: South of Shanhai 2 Road, West of Chaoshi Road, Rizhao, Shandong, China
Copyright © 2026 | Dongsheng Carpet Group Co., Ltd.  Sitemap
Customer service
detect