Dongsheng Carpet's current standard MOQs are as follows: Axminster carpet, printed carpet, carpet tiles, machine-tufted carpet, and Wilton carpet are all 100 m² (100 sqm); hand-tufted carpet is 1 m². This article covers four areas—MOQ, sampling, lead time commencement, and inspection standards—to help B2B buyers reduce order changes, delays, batch color shading, and inspection disputes before placing orders.
As a commercial carpet manufacturer, Dongsheng sets different MOQs based on product structure. The table below is intended for importers, distributors, hotel projects, design firms, contractors, and FF&E procurement teams when shortlisting products at the early stage.
Product Type | Dongsheng Standard MOQ
| What to Confirm When Inquiring
|
Axminster Carpet | 100㎡ | Pattern repeat, number of colors, pile yarn material, width, and total project volume |
Printed Carpet | 100㎡ | Backing and fiber, pattern files, color standards, finished dimensions or width |
Carpet Tiles | 100㎡ | Tile face dimensions, pile structure, fiber, backing, installation direction, and replenishment plan |
| 100㎡ | Loop or cut pile, pile height, pile weight, density, width, and backing |
Hand-Tufted Carpet | 1㎡ | Pattern complexity, material, shape, thickness, edge finishing, and single-piece dimensions |
Wilton Carpet | 100㎡ | Structure, material, pattern repeat, colors, width, and project quantity |
The above are Dongsheng's standard MOQs. Non-standard widths, special materials, special backings, complex patterns, specified testing, or special packaging may change production conditions, so buyers should rely on written confirmation for each specific project. Don't just ask "What's the minimum you can do?"—also ask "Is MOQ calculated by entire order, by individual pattern, by individual color, or by individual specification?"
MOQ is only an order threshold; it does not mean all colors, patterns, or specifications can be combined toward the minimum. When inquiring, state the product type, total quantity, quantity per design or color, application area, technical specifications, destination country testing requirements, and planned shipment date. Final MOQ, sampling method, and lead time are subject to the formal quotation or order confirmation Dongsheng Carpet issues for the specific project.
A project's total area reaching 100 m² does not necessarily mean every individual design meets production conditions. The following four scenarios are most prone to misunderstandings.
What buyers should do
Add five columns to your inquiry sheet: "Product Type, Design Number, Color Number, Individual Quantity, Total Quantity." The carpet supplier should confirm whether each individual item can be produced, not just whether the total order area qualifies. This surfaces problems at the quotation stage rather than after patterns and samples are confirmed and quantities need to change.
The purpose of sampling is not just to check whether the color is "close enough," but to establish a common baseline for mass production and shipment acceptance. Dongsheng typically supports pattern or color sampling, with strike-off in as fast as 72 hours; complete samples usually take about 7 days. Actual timing depends on product type, material, dimensions, pattern complexity, and the testing items that need confirmation.
Confirmation Item | What Buyers Should Specify
| Why It Matters
|
Product and material | Product type, fiber composition, yarn or backing | Avoid mismatch between sample and mass production structure |
Color | Pantone, physical color swatch, or mutually agreed color standard | Screen display and different light sources cannot replace physical confirmation |
Pattern | Source file, scale, repeat, direction, positioning relationships | Affects layout, seams, corridor direction, and final visual effect |
Dimensions and structure | Finished dimensions, width, loop or cut pile, density | Determines consumption, installation method, and performance |
Pile Parameters | Pile height, pile weight, and allowable tolerance | Cannot be judged by total thickness or hand feel alone |
Backing and Edges | Backing system, edge treatment, irregular contours | Affects installation, flatness, and finished dimensions |
Performance Requirements | Destination country, project standards, test methods, and report requirements | Must be confirmed before production, cannot be added temporarily at shipment |
After a sample is approved, retain a dated and version-numbered approval sample or Golden Sample, and both parties should keep the corresponding technical specification sheet. If the buyer later changes color, pattern, dimensions, material, or backing, reassess whether re-sampling is needed and whether price and lead time are affected.
Production lead time is a duration, not a standalone date. Dongsheng's standard mass production cycle is typically 30 to 45 days, but it should be counted from when all agreed order commencement conditions are met—not from the first inquiry or the day the pattern is received. Product, specifications, quantity, production scheduling, and special testing all affect actual timing.
Milestone | Evidence Both Parties Need to Confirm
| Impact on Lead Time
|
Specification freeze | Final product, quantity, colors, patterns, dimensions, structure, and packing list | If specifications are not frozen, accurate scheduling is impossible |
Order effectiveness | Contract, payment terms, and agreed commencement conditions | Subject to contract terms |
Sample approval | Approval sample book, signature, or written approval record | Changes to samples will postpone production start |
Production start and in-process inspection | Scheduling date, key process records, and batch information | Determines mass production completion date |
Pre-shipment inspection | Inspection date, standards, sampling scope, and disposition conclusions | Should reserve time for re-inspection or corrective action |
Booking and shipment | Estimated completion date, loading conditions, and shipping arrangements | Production lead time is not the same as arrival time at port |
The procurement contract should at minimum specify the lead time commencement conditions, estimated completion date, and estimated shipment date. If the project has a fixed opening, delivery, or installation window, also reserve time for third-party inspection, corrective action, booking, and transportation.
Inspection cannot simply be written as "quality acceptable." An executable inspection standard should be based on the signed specification sheet, approval sample, order, and applicable testing requirements, and should specify sampling methods, allowable tolerances, defect determination, and handling of non-conforming products.
The buyer, buyer's representative, or a mutually agreed third party may conduct pre-shipment inspection at the agreed time. If third-party inspection is required, specify the agency, cost, sampling scope, and release conditions at the order stage to avoid changing standards after production is complete.
The more complete the information, the easier it is for a commercial carpet manufacturer to provide executable MOQ, sampling plans, and lead times—rather than just a temporary unit price. Provide the following in one go:
Suggested inquiry wordingPlease confirm MOQ, sample type, sample lead time, sample cost, mass production commencement conditions, estimated completion date, inspection standards, and estimated shipment date separately by product and design. If any color, pattern, or specification does not meet production conditions, please note it separately in the quotation. |
|---|
When sourcing bulk custom commercial carpet, the most reliable decision basis is not the lowest unit price — it's a clear product breakdown, verifiable approved samples, a defined lead-time start point and enforceable inspection standards.
Dongsheng Carpet's standard MOQ is 100 sqm for Axminster Carpet, Printed Carpet, Carpet Tiles, Machine-Tufted Carpet and Wilton Carpet, and 1 sqm for Hand-Tufted Carpet.
When submitting project details, list quantities separately by design, colour and specification. This makes quoting, sampling, production scheduling and inspection far more accurate.
Project country and application | Product type | Pattern or design files | Quantity per color and specification | Material and structure requirements | Testing standards | Target shipment date | Packaging and inspection requirements